Path WB: G17/G18/G19 feature request (or show me where it is).
Forum rules
Be nice to others! Respect the FreeCAD code of conduct!
Be nice to others! Respect the FreeCAD code of conduct!
Path WB: G17/G18/G19 feature request (or show me where it is).
Hi,
The very first stop is to say a Big TNX for G54...G59.X!
It is the really big deal.
But. The means of WCS are not working in full power without changing orientations (I mean there fixtures).
Let's continue on sample:
As you see, as minimum as 4 ops required: contour+pocket, T-sloting, drills+counterbores, cutting of a stock from other side.
While first and last operations easily fits to WCS without orientation change and can/should/may to be processed in G17+G54+G55, the second and third op with drilling requires coordinate system rotation.
Creating new Job for new (ongoing) fixture is obvious. But my machine has ability to save me there and omit the second and third fixtures.
Cheers,
Eugenijus.
The very first stop is to say a Big TNX for G54...G59.X!
It is the really big deal.
But. The means of WCS are not working in full power without changing orientations (I mean there fixtures).
Let's continue on sample:
As you see, as minimum as 4 ops required: contour+pocket, T-sloting, drills+counterbores, cutting of a stock from other side.
While first and last operations easily fits to WCS without orientation change and can/should/may to be processed in G17+G54+G55, the second and third op with drilling requires coordinate system rotation.
Creating new Job for new (ongoing) fixture is obvious. But my machine has ability to save me there and omit the second and third fixtures.
Cheers,
Eugenijus.
-
- Posts: 991
- Joined: Wed Mar 27, 2019 10:45 am
Re: Path WB: G17/G18/G19 feature request (or show me where it is).
Should be moved to PathWB forum.
chrisb
Re: Path WB: G17/G18/G19 feature request (or show me where it is).
Mod note: moved thread to Path/CAM subforum
Alone you go faster. Together we go farther
Please mark thread [Solved]
Want to contribute back to FC? Checkout:
'good first issues' | Open TODOs and FIXMEs | How to Help FreeCAD | How to report Bugs
Please mark thread [Solved]
Want to contribute back to FC? Checkout:
'good first issues' | Open TODOs and FIXMEs | How to Help FreeCAD | How to report Bugs
- dubstar-04
- Posts: 698
- Joined: Mon Mar 04, 2013 8:41 pm
- Location: Chester, UK
- Contact:
Re: Path WB: G17/G18/G19 feature request (or show me where it is).
Do you mean you have a 5 axis machine?liutas4x4 wrote: ↑Wed Aug 28, 2019 12:38 pm Hi,
The very first stop is to say a Big TNX for G54...G59.X!
It is the really big deal.
But. The means of WCS are not working in full power without changing orientations (I mean there fixtures).
Let's continue on sample:
019_003.png
As you see, as minimum as 4 ops required: contour+pocket, T-sloting, drills+counterbores, cutting of a stock from other side.
While first and last operations easily fits to WCS without orientation change and can/should/may to be processed in G17+G54+G55, the second and third op with drilling requires coordinate system rotation.
Creating new Job for new (ongoing) fixture is obvious. But my machine has ability to save me there and omit the second and third fixtures.
Cheers,
Eugenijus.
- dubstar-04
- Posts: 698
- Joined: Mon Mar 04, 2013 8:41 pm
- Location: Chester, UK
- Contact:
Re: Path WB: G17/G18/G19 feature request (or show me where it is).
Can you be more detailed?
- dubstar-04
- Posts: 698
- Joined: Mon Mar 04, 2013 8:41 pm
- Location: Chester, UK
- Contact: